Skip to main content
x
Play video and select frame to capture or upload thumbnail
  Play   Capture Upload Own Image

Queensland gold mine lives on as pumped hydro plant

By John Sheridan in General 47 views 27th Mar, 2023 Video Duration: N/A
ARENA has announced up to $47 million in funding for Genex to construct a pumped hydro energy storage system at the former Kidston Gold Mine in north Queensland. The facility will store energy from a 50 MW solar farm that is already operating on the site as well as a planned 150 MW wind farm that will begin construction in 2022.

People In This Video
No users are tagged in this video


0
0
0
0
0
0
Comments (0)
Unable to load tooltip content.